This building
expansion project was the first phase of a formulation development
process facility and an office administration expansion
to the existing Building 8, on Amgen's Thousand Oaks Campus.
The 2-story, 14.000 square-foot structure
was constructed adjacent to an existing 32,000 square-foot
single-story laboratory building.
The project area included a series
of process rooms for production of small batches of tablets
for drug discovery. The facility was constructed as a separate
building to allow future expansion and isolation of the
HVAC and laboratory utilities from adjacent spaces.
